Two other men worked hard to clear several tree stumps out of the back courtyard.
After they dug around the stumps using hand spades and a pick axe, Bill used the tractor to push and pull out the stumps.
We purchased three used insulated cooler doors from a used equipment trader in Hermosillo.
We have been building frames and installing these doors. These doors are the first sign that this building is going to be used for meat processing. Here is Fernando helping Duane install the door latch strike.
Fernando and Fernando (father and son) have been remodeling the bathrooms. Here is the employee bath room with the newly-installed tile in the shower.
Here is the bathroom with the floor tile and toilet installed.