Moses has been working on repairing the outside walls of the building.  First, he chips off the old loose stucco.  Then, he used nails to attach chicken wire to the adobe.  Finally, he puts cement on the chicken wire-covered adobe.
IMG_2260
Two other men worked hard to clear several tree stumps out of the back courtyard.
IMG_2123
After they dug around the stumps using hand spades and a pick axe, Bill used the tractor to push and pull out the stumps.
IMG_2071 
We purchased three used insulated cooler doors from a used equipment trader in Hermosillo.
IMG_2121
We have been building frames and installing these doors.  These doors are the first sign that this building is going to be used for meat processing.  Here is Fernando helping Duane install the door latch strike.
IMG_2287
Fernando and Fernando (father and son) have been remodeling the bathrooms.  Here is the employee bath room with the newly-installed tile in the shower.
IMG_2262
Here is the bathroom with the floor tile and toilet installed.
IMG_2288