A crew of two men have been working on the front of the building. First they repaired the broken parts of the wall with concrete. Then they applied a white material shown here and textured it.
Then we did a color test of three different colors before we finalized our pick for the front of the building. Surveying neighbors and random people on the street, the vote was 2-8-2 for the left-middle-right, respectively. The dark brown color is for the trim.
Here they are painting the front.
Here is the building after painting. The only things left to do on the front of the building are the rain gutter, the awnings for the coffee shop, and signage.
As a comparison, here is the front of the building before we started remodeling.
They also tore up the sidewalk in front of the loading dock ...
And the building of the wall of it was of jasper: and the city was pure gold, like unto clear glass. – Revelation 21:18.
No comments:
Post a Comment